CONNECT WITH US

Contact Hasy Industries

Our engineering team is always ready to consult, custom-design, and manufacture optimal automation solutions for your business.

Headquarters & Factory

No. 12, Lane 115 Dinh Cong, Hoang Mai District, Hanoi, Vietnam

Hotline / WhatsApp

+84 989 919 486

24/7 Technical Support

Business Email

hi@hasyindustries.com

RFQ & Technical Drawings

Working Hours

Mon – Sat: 08:00 – 17:30

Sunday: Emergency Support

ONLINE INQUIRY

Request a Quote & Consultation

Fill in your requirements below and our team will get back to you within 2 hours.






🔒 100% Confidential
⚡ 2-Hour Response
🤝 On-site Assessment

LOCATION MAP

Hasy Industries Location


Open in Google Maps

Visiting Guidance: For factory tours or machinery testing, please schedule in advance via Hotline +84 989 919 486.

Why Choose Hasy Industries?

⚙️

Top Engineering Experts

Led by professors and engineers from Hanoi University of Science and Technology with 12+ years of R&D experience.

🎯

Customized Tailor-Made Solutions

Engineered precisely to match your factory layout, production output, and investment budget.

🛡️

Dedicated Long-term Support

Full technology transfer, on-site operational training, and lifetime maintenance with domestic spare parts.

DISCOVERY & RFQ CONSULTATION

Frequently Asked Questions on Plant Surveys & Technical RFQs

Key facts regarding complimentary site survey policies, proposal turnaround times, and preliminary technical scoping.

No, initial plant surveys are 100% complimentary. HASY chief mechanical and automation engineers conduct on-site walk-throughs across manufacturing industrial clusters in Northern Vietnam to assess floor bottlenecks and line layouts without consultation fees.

Typically within 5 to 7 business days following our technical discovery survey, our R&D team delivers a preliminary 3D concept layout, cycle-time feasibility study, and an itemized commercial quotation.

To streamline initial technical assessment, please have ready: (1) Product dimensional drawings or physical samples; (2) Target throughput requirements (units/minute or units/shift); (3) Floor space boundary constraints; and (4) Video documentation of the existing manual bottleneck process.